Pre Pour Foundation Inspection

1 - General Information

Site Faces
East
Soil Condition
Damp
Weather Conditions
Warm
Temperature
75(F)
Plan Date and Revision
04/16/2019

2 - I. Site Preparation

$
Credit
Comment
2.1.1 - Grading and Drainage

Insufficient slope away from foundation
West, North

Building code (IRC R401.3)  requires the site grading to direct water away from the foundation.  Where space is available the ground should drop a minimum of 6" in 10' in a direction perpendicular to the foundation.  If this is not possible due to adjacent property lines or other obstructions, swales or a drain system may be used to convey water away from the foundation.  These are the minimum prescriptive building code requirements. The engineer that designed the foundation may have grading requirements that are more stringent than the IRC requirements.     

3 - II. Formwork

$
Credit
Comment
3.1.1 - Formwork

Form boards are damaged and not straight
East

$
Credit
Comment
3.2.1 - Shear Wall Tie Downs

Shear wall tie downs have not been installed

$
Credit
Comment
3.3.1 - Brick Ledges

Brick ledge has not been installed

4 - III. Reinforcement and Beams

IN NI NP D
4.1 Tendon Placement and Clearances X X
4.2 Rebar Placement and Clearances X X
4.3 Beams X X
  • IN = Inspected
  • NI = Not Inspected
  • NP = Not Present
  • D = Deficiency
$
Credit
Comment
4.1.1 - Tendon Placement and Clearances

Tendon has insufficient clearance at reentrant corner
Southwest, North

$
Credit
Comment
4.1.2 - Tendon Placement and Clearances

Tendon does not have sufficient cover at base of beam
South (pictured), at garage door

Tendon needs to have sufficient coverage with concrete to properly function. Refer to plans for required tendon position.

$
Credit
Comment
4.1.3 - Tendon Placement and Clearances

Pocket former is not flush with forms
Multiple Locations

This may allow concrete to enter the wedge cavity. Concrete that enters the wedge cavity may  cause complications during tendon stressing. 

$
Credit
Comment
4.2.1 - Rebar Placement and Clearances

Rebar chairs have not been installed
Multiple Locations

$
Credit
Comment
4.2.2 - Rebar Placement and Clearances

Spread footing is not installed per plans
At patio

Plans require a double matt of #4 @ 6". Additionally, chairs have not been installed.

$
Credit
Comment
4.3.1 - Beams

Loose material has not been removed from beams
Multiple Locations

$
Credit
Comment
4.3.2 - Beams

Rebar has not been installed per plans
Northeast (section 6) Northeast

Rebar has been spliced and is not continuous as specified in plans. (Section 6) Additionally the rebar does not extend beyond the beam length as required by the plans.

5 - IV. Plumbing

IN NI NP D
5.1 Plumbing Penetrations X
  • IN = Inspected
  • NI = Not Inspected
  • NP = Not Present
  • D = Deficiency

6 - V. Vapor Barrier

IN NI NP D
6.1 Vapor Barrier X
  • IN = Inspected
  • NI = Not Inspected
  • NP = Not Present
  • D = Deficiency

7 - VI. Other

IN NI NP D
7.1 Trash X X
7.2 Retaining wall X X
  • IN = Inspected
  • NI = Not Inspected
  • NP = Not Present
  • D = Deficiency
$
Credit
Comment
7.1.1 - Trash

Trash needs to be removed from inside forms

This will create voids in beam and slab which will may affect the performance and appearance of the foundation. 

$
Credit
Comment
7.2.1 - Retaining wall

Cracking observed in retaining wall
Southern wall at far west end